home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / spacedig / V10_4 / V10_403.ZIP / V10_403
Internet Message Format  |  1991-07-08  |  18KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/8ZehMNW00VcJQ3I05I>;
  5.           Wed, 10 Jan 90 01:28:42 -0500 (EST)
  6. Message-ID: <EZehLwG00VcJA3GE55@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Wed, 10 Jan 90 01:28:13 -0500 (EST)
  11. Subject: SPACE Digest V10 #403
  12.  
  13. SPACE Digest                                     Volume 10 : Issue 403
  14.  
  15. Today's Topics:
  16.           NASA Prediction Bulletins:  Space Shuttle
  17.           Soviet Mir Crew update: Space Walk Jan 8th
  18.            Payload Status for 01/08/90 (Forwarded)
  19.             Re: Nuclear Reactors in Space
  20.                DUMBO vs NERVA?
  21.         Ariane, Spot, Microsat launch delayed
  22.       NASA and Japan sign GEOTAIL agreement (Forwarded)
  23.             Re: Nuclear Reactors in Space
  24.        Re: March 1990 ANALOG article on self-refueling vehicles
  25. ----------------------------------------------------------------------
  26.  
  27. Date: 9 Jan 90 23:06:21 GMT
  28. From: ncis.tis.llnl.gov!blackbird!tkelso@lll-winken.llnl.gov  (TS Kelso)
  29. Subject: NASA Prediction Bulletins:  Space Shuttle
  30.  
  31.  
  32. The most current orbital elements from the NASA Prediction Bulletins are
  33. carried on the Celestial RCP/M, (513) 427-0674, and are updated several times
  34. weekly.  Documentation and tracking software are also available on this
  35. system.  As a service to the satellite user community, the most current
  36. elements for the current shuttle mission are provided below.  The Celestial
  37. RCP/M may be accessed 24 hours/day at 300, 1200, or 2400 baud using 8 data
  38. bits, 1 stop bit, no parity.
  39.  
  40. STS 32     
  41. 1 20409U 90002  A 90  9.70320456 -.00080196  00000-0 -35592-3 0    29
  42. 2 20409  28.5036 139.8918 0048305  45.5590 314.7076 15.81699374    21
  43. -- 
  44. Dr TS Kelso                           Asst Professor of Space Operations
  45. tkelso@blackbird.afit.af.mil          Air Force Institute of Technology
  46.  
  47. ------------------------------
  48.  
  49. Date: Mon, 8 Jan 90 17:26:34 EST
  50. From: Glenn Chapman <glenn@ll-vlsi.arpa>
  51. To: biro%hydra.enet.dec.com@decwrl.dec.com, isg@bfmny0.uu.net,
  52.         klaes%wrksys.dec@decwrl.dec.com, lepage%vostok.dec.com@decwrl.dec.com,
  53.         space-editors-new@andrew.cmu.edu, yaron@astro.as.utexas.edu
  54. Subject: Soviet Mir Crew update: Space Walk Jan 8th
  55.  
  56.      On board the Mir space station on Dec. 25th Alexander Viktorenko and 
  57. Alexander Serebrov activated the Protein crystal growth experiments for 
  58. Payload Systems, which will continue for the 56 days. This commercial 
  59. experiment was brought up on the Progress M-2 cargo capsule on Dec. 22. In 
  60. the west Protein crystal growth experimental results have been announced 
  61. from work done on the Sept. 1988 shuttle flight. Comparing growths done on 
  62. the ground by the best equipment with that done in orbit showed in many 
  63. cases the zero G samples were had less defects, and were larger. The 
  64. importance of such crystal growth lies in the ability to determine the 
  65. structure of unusual proteins, which are required by pharmaceutical 
  66. companies to better produce the compounds. (New Scientist Dec 18, Science 
  67. Dec., Radio Moscow Dec. 24, and Payload Systems press release)
  68.      On New Year's Eve they had a day of celebration complete with a 
  69. plastic fir tree, canned sturgeon, fruit sticks, black current juice, and 
  70. fresh lemons (but not the traditional champagne: that is prohibited in 
  71. orbit). Both crew and mission control, along with the crew's family, 
  72. exchanged greeting at the stroke of midnight. On Jan. 6th the crew finished 
  73. one set of extremely pure crystal growth experiments which took 150 hours 
  74. to run. They also began preparations for their first space walk, which was 
  75. announced for Jan. 8th. (Our mailer was down for this posting which was to 
  76. go out on Friday, but a quick update: the space walk will begin at 20:24 
  77. Moscow Time, about 12:24 EST) This will probably test out the new airlock 
  78. on the Kvant 2 module. Viktorenko and Serebrov have now been up there for 
  79. 123 days. (Radio Moscow Dec. 25, Jan. 1-6, TASS press Jan 1)
  80.      More details have been released about the next module addition to Mir. 
  81. Called the Technology module (possibly Kvant 3) it will be launched in 
  82. March or April of this year, for the use of the Soyuz TM-9 crew that will 
  83. arrive in February. Massing 19.5 tonnes, its length is 12 meters (39 ft.) 
  84. and adds 20 Kilowatts of power to Mir. If correct the stated power addition 
  85. is the same as all of the present supplies of Mir, Kvant 2 and the space 
  86. mounted tower erected in June '87 and would require almost twice the solar 
  87. panel area of Mir's initial 76 sq. meters (817 sq. ft.). In addition the 
  88. front end of the module contains a ball shaped multiple docking port 
  89. similar to that on Mir itself. This will be used to dock their shuttle 
  90. Buran to Mir in the early 1990's. The main experimental equipment on board 
  91. will be large furnaces for semiconductor processing (almost pilot line 
  92. production levels are planned), a KFA-1000 camera system for earth 
  93. observations, a greenhouse and large 100 liter (3.5 cu. ft.). The high 
  94. power capacity is required to run all the processing equipment. (AW&ST Jan 
  95. 1)
  96. Extensive agreements for cooperation in space medicine and biology were 
  97. arranged in December between the US and USSR. These cover the creation of 
  98. compatible data bases for the manned medical information (Soviet long term 
  99. data is being traded for US short term mission results). There has been a 
  100. problem in comparing biological experimental results of the two programs 
  101. for years, and the aim of this is to eliminate the difficulties. Bone 
  102. density measurements have been one area of conflict and uniform methods 
  103. will be created there. Also NASA will supply heart monitoring equipment to 
  104. be used on an upcoming Mir mission. (AW&ST Jan 1)  Sojuzkarta has a 
  105. contract with the British firm Sigma to market earth observation pictures 
  106. from the Soviet film return style satellites. The important selling point 
  107. of these photos is their 5 meter (16 ft.) resolution, compared with the 10 
  108. meter capability of the French Spot, and 30 meter resolution of the current 
  109. Landsat. (New Scientist Dec. 16)
  110.      So the Russians have begun using Mir for commercial processing 
  111. purposes.  Now they must see if the Kvant 2 air lock is up to specs.
  112.  
  113.                                              Glenn Chapman
  114.                                              MIT Lincoln Lab
  115.  
  116. ------------------------------
  117.  
  118. Date: 8 Jan 90 23:22:25 GMT
  119. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  120. Subject: Payload Status for 01/08/90 (Forwarded)
  121.  
  122. Daily Status/KSC Payload Management and Operations 01-08-90
  123.        
  124.          
  125. - STS-31R HST (at VPF) -
  126.       
  127. Aft shroud cleaning/inspection continues.  MUE validation was  
  128. worked over weekend and will continue today in preparation for
  129. the HST cite test on Thursday.                                 
  130.         
  131. - STS-32R SYNCOM (at Pad A) -
  132.        
  133. Battery conditioning was completed yesterday in preparation  
  134. of todays scheduled launch.  Experiments have been installed      
  135. and checked out.     
  136.        
  137. - STS-35 ASTRO-1/BBXRT (at O&C) -
  138.         
  139. Cite testing continued over the weekend and will pick up    
  140. again this morning.  Broken backshell has been repaired.  
  141. The fuse area was evaluated and the bad fuse on the SPDB         
  142. was removed and replaced.  During Saturday's testing the same 
  143. fuse blew again.  Today will work troubleshooting steps to        
  144. evaluate the fuse.
  145.  
  146. - STS-40 SLS-1 (at O&C) -
  147.         
  148. MVAK familiarization and training was completed on Saturday. 
  149. Structural mods on rack 3, 7, 9, 11 and 12 continue.  Pyrell  
  150. foam replacement continues.
  151.  
  152. - STS-42 IML (at O&C) -
  153.       
  154. Rack 7, 9 and 11 structural mods continue.  
  155.  
  156.  
  157. - STS-45 ATLAS-1 (at O&C) -
  158.  
  159. On pallet 1 250 plug & inserts were installed.
  160.  
  161. ------------------------------
  162.  
  163. Date: 8 Jan 90 17:00:18 GMT
  164. From: tramp!serre@boulder.colorado.edu  (SERRE GLENN)
  165. Subject: Re: Nuclear Reactors in Space
  166.  
  167. First, a question: Henry (if I may be so familiar), why would one want to 
  168. produce Pu-238 instead of Pu-239 in a breeder reactor?  I thought the whole
  169. idea was to use the Pu-239 that is easy to generate from U-238 to power the
  170. reactor (this is in reference to reactors on the moon).  
  171.  
  172. Now, a couple of facts (I think):
  173.  
  174. The original thrust :-) of this thread was using nuclear power for propulsion
  175. systems, so here are a few items:
  176.  
  177. 1) Fuel for these proposed systems.  A recent poster mentioned that nuclear
  178. and electo-arc rockets wanted hydrazine as a propellent.  What he probably
  179. meant was that they want hydrogen, because of its low molecular/atomic weight.
  180. The extra energy you might get from breaking down the hydrazine isn't worth
  181. the effort when you have all that nuclear energy.  
  182.  
  183. 2) Nuclear power vs. solar concentrator systems for propulsion.  The solar 
  184. powered system referred to here probably involves focussing solar radiation
  185. on a small heating tube where the the propellent is heated to high temperatures
  186. (BTW, you can get 2-3 thousand degrees out of this system) and sent through a
  187. a nozzle.  This produces high ISP (efficiency), but low thrust.  It also 
  188. requires a large mirror.  Therein lie two problems.  a) The low thrust means 
  189. that interplanetary missions would be REALLY long.b)The LARGE mirrors that would
  190. be required for operation near Mars (because of the reduced solar radiation)
  191. would add lots of mass (there might also be some problems with control of the
  192. mirror.). Operation in the outer parts of the solar system would be out of
  193. the question.  
  194.    Nuclear powered systems have the advantages of high thrust with moderate ISP
  195. (which would allow for more reasonable mission times) and the capability to 
  196. operate anywhere in space with the same performance characteristics.  Also,
  197. the high power-to-weight ratios possible with nuclear reactors makes them 
  198. ideal for electrical propulsion schemes.  
  199.  
  200. Sorry for the pontification, but I had to get it off my chest.  Flames by 
  201. e-mail.  
  202.  
  203. --Glenn Serre
  204. serre@tramp.colorado.edu
  205.  
  206. ------------------------------
  207.  
  208. Date: 9 Jan 90 00:11:30 GMT
  209. From: snorkelwacker!mintaka!oliveb!pyramid!weitek!sci!daver@tut.cis.ohio-state.edu  (Dave Rickel)
  210. Subject: DUMBO vs NERVA?
  211.  
  212.  
  213. I seem to remember that someone sometime last year was going to post a
  214. comparison of the DUMBO and NERVA programs.  I don't remember seeing it; if
  215. i missed it, could someone send it to me?  Thanks.
  216.  
  217.  
  218. david rickel
  219. decwrl!sci!daver
  220.  
  221. ------------------------------
  222.  
  223. Date: 8 Jan 90 17:44:18 GMT
  224. From: idacrd!mac@princeton.edu  (Robert McGwier)
  225. Subject: Ariane, Spot, Microsat launch delayed
  226.  
  227. Due to a faulty tape recorder, the launch of the Spot-2, Microsat, UOSAT
  228. payloads on the Ariane 40 configuration (the first 40, no strap ons) has
  229. been delayed until at least January 26 at 0135 UTC.  I will post new
  230. orbital elements on CI$ and AMSAT BBS's.  The tape recorder was not
  231. on the small sats of course, it was on the multi-million dollar
  232. SPOT-2 earth imaging, earth resources satellite.  This quite serious
  233. delay is pushing the already delayed launch schedule for ARIANE further
  234. into the future.
  235.  
  236. Bob McGwier
  237. N4HY
  238.  
  239. -- 
  240. ____________________________________________________________________________
  241.     My opinions are my own no matter    |    Robert W. McGwier, N4HY
  242.     who I work for! ;-)            |    CCR, AMSAT, etc.
  243. ----------------------------------------------------------------------------
  244.  
  245. ------------------------------
  246.  
  247. Date: 8 Jan 90 18:39:46 GMT
  248. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  249. Subject: NASA and Japan sign GEOTAIL agreement (Forwarded)
  250.  
  251. Debra J. Rahn
  252. Headquarters, Washington, D.C.                    January 8, 1990
  253.  
  254.  
  255. RELEASE:  90-4
  256.  
  257. NASA AND JAPAN SIGN GEOTAIL AGREEMENT
  258.  
  259.      NASA and Japan have completed an agreement for the launch
  260. of Japan's GEOTAIL spacecraft on a Delta II launch vehicle,
  261. from the Kennedy Space Center, Fla., in July l992.  Richard H. 
  262. Truly, NASA Administrator, and Professor Jun Nishimura, Director-
  263. General of Japan's Institute of Space and Astronautical Science 
  264. (ISAS), signed the agreement on behalf of the U.S. and Japanese 
  265. agencies implementing this cooperative activity.
  266.  
  267.     The GEOTAIL spacecraft is a bilateral cooperative mission
  268. between NASA and ISAS which will investigate the stored energy
  269. in the geomagnetic tail of the Earth.  GEOTAIL will use a double 
  270. lunar-swingby orbit to take measurements in the region from 8 to 
  271. 220 Earth radii (Re).  
  272.  
  273.      These data will be compared with other NASA missions in the 
  274. Global Geospace Science (GGS) Program.  GGS will investigate 
  275. cause and effect relationships in the global flow of energy in 
  276. the Earth's magnetosphere.  Following the geomagnetic tail 
  277. investigation, GEOTAIL will move to an 8 by 32 Re orbit to 
  278. conduct studies in the equatorial magnetosphere.
  279.  
  280.      NASA will contract for the launch services for Geotail.  
  281. NASA recently competitively awarded the McDonnell Douglas Corp. a 
  282. contract to provide medium performance class launch services for 
  283. a series of its missions on their commercial Delta II launch 
  284. vehicle.  Geotail will be the first mission in the series of 
  285. launch services.  
  286.  
  287.      ISAS will provide some of the science instruments in 
  288. addition to the spacecraft.  NASA also will provide science 
  289. instruments and tracking via the Deep Space Network.  The science 
  290. data from GEOTAIL will be shared among all the participants in 
  291. the GGS program.
  292.  
  293.     GEOTAIL is the largest NASA/Japan international cooperative
  294. space science mission to date.
  295.  
  296. ------------------------------
  297.  
  298. Date: 8 Jan 90 18:52:43 GMT
  299. From: ecsvax.uncecs.edu!dgary@mcnc.org  (D Gary Grady)
  300. Subject: Re: Nuclear Reactors in Space
  301.  
  302. In article <9537@hoptoad.uucp> tim@hoptoad.UUCP (Tim Maroney) writes:
  303. >Those interested in the subject should be sure to read the November 20
  304. >editorial in "The Nation" documenting the fact that NASA's own studies
  305. >have shown that concentrated solar array technology would have worked
  306. >as well as nuclear reactor technology, as well as the followup in the
  307. >letters column in the current (January 8/15) issue.
  308.  
  309. The problems with getting solar panels to work at Jupiter -- a solar
  310. constant less than 4 percent that in Earth orbit and an extremely
  311. hostile environment  -- are potentially solvable but have not yet been
  312. solved, despite NASA's continuing work on improved solar power for
  313. spacecraft.  I urge you to seek more technically reliable sources than
  314. The Nation and to take political polemics with a grain of salt.  More
  315. specifically:
  316.  
  317. Grossman and Long, authors of the material you quote, are out to push a
  318. conspiracy theory and are disinclined to let facts get in their way.
  319. When JPL's John Casani raised important technical points in his letter
  320. (published in the January 8/15 issue), the best response they could
  321. manage was, "He obviously wishes to perpetuate the plutonium con."
  322.  
  323. >However, projections in 1981 were that it could
  324. >have been developed within two or three years from that date.
  325.  
  326. Even Grossman and Long managed to get this right.  Reread your source.
  327. That report was in 1986 (not 81) and projected that it MIGHT be
  328. possible to get CSA power working for Galileo in two or three years,
  329. given "unlimited funding" (!!!).  The 1981 report said that "the severe
  330. environmental constraints and the embryonic state of CSA development
  331. indicate that a CSA will not displace the RTG on the Galileo mission."
  332.  
  333. Another important point, which Grossman and Long deal with by ignoring,
  334. is that a concentrated solar array would probably have weighed more than
  335. an RTG source and hence might well have made the mission a practical
  336. impossibility.  (The 1981 study saying it could work -- given that the
  337. CSA technology could be perfected -- assumed a launch using a Centaur,
  338. something NASA now refuses to fly in the Shuttle.)
  339.  
  340. >But then the military wouldn't have any excuse to go testing
  341. >RTG's in space, and this vital component of SDI technology would
  342. >languish.
  343.  
  344. Radioisotope thermoelectric generators appeared before anybody had
  345. heard of SDI.  They have powered every spacecraft the U.S. has sent
  346. beyond the orbit of Mars and quite a few others besides, not to mention
  347. plenty of stations on Earth.  Saying that NASA is testing RTGs for
  348. military purposes is like saying that NASA employees come to work in
  349. cars so the military can study motorized personnel transport.
  350.  
  351. Moreover, RTGs are not useful for the power levels required by SDI; for
  352. that you need a nuclear reactor.  And, in case you're unaware of it, RTG
  353. research is essentially irrelevant to nuclear reactors in space.
  354.  
  355. >Nuclear power in space is done for military reasons, not technical
  356. >reasons.
  357.  
  358. Flatly not true.  RTGs are safe.  Not perfectly safe, but safer than
  359. allowing airplanes to fly or power companies to distribute electricity
  360. to your home.
  361.  
  362. Disclaimer:  I have no relation with the U.S. government or any NASA
  363. contractor, and my only connection with The Nation is as a subscriber.
  364. -- 
  365. D Gary Grady
  366. (919) 286-4296
  367. USENET:  ...!mcnc!ecsvax!dgary
  368. BITNET:  dgary@ecsvax.bitnet
  369.  
  370. ------------------------------
  371.  
  372. Date: 8 Jan 90 18:16:43 GMT
  373. From: jfcl.dec.com!imokay.dec.com!borsom@decvax.dec.com  (Doug Borsom)
  374. Subject: Re: March 1990 ANALOG article on self-refueling vehicles
  375.  
  376. In article <1990Jan5.105624.15513@jarvis.csri.toronto.edu> 
  377. hogg@db.toronto.edu (John Hogg) writes:
  378.  
  379. >No treaty in existence bans space-based
  380. >reactors, and the Soviets are the only ones operating them at present.
  381.  
  382. I thought that one of the objections to several of the SDI proposals
  383. was that they would require orbiting nuclear reactors to power them
  384. and such stuff was prohibited by the ABM treaty (which, of course, the
  385. US never ratified, but which we pretty much observe).  Perhaps
  386. the ABM treaty applied only to nuclear reactors used in conjunction
  387. with weapons systems.
  388.  
  389. Anyone have better information or a better memory on this?
  390.  
  391. ------------------------------
  392.  
  393. End of SPACE Digest V10 #403
  394. *******************
  395.